Installation Of The Cable
The heating cable is laid on Deviflex better free space, ie to the one area that does not work stationary equipment (refrigerator, stove, kitchen wall, a washing machine, etc.) Step stacking (the distance between the lines) of the cable allows you to save much power at 1m.kv. that count and lay in the design phase. To comply with the uniform distribution of heat in the floor thickness of concrete or cement-sand screed over cable with a specific heat input capacity of 17-18 W / m (DTE-17, DTIP-18) must be at least 3 cm, if there are no other restrictions (such as mechanical strength). Reduce the thickness of the screed (1.5-2 cm) is possible, if we use heating cable with a lower heat input capacity of, for example, 10 W / m (DTIE-10, DTIP-10). The heating cable can be switched on only after the natural hardening of ties (for cement-sand screed is about 28-30 days for the putty to Thin floors 3-7 days). Installation Sequence 1.
Define where to install the thermostat (if necessary, make Stroebe in the wall to flush). And also to provide insulation and intermediate material (For example, reinforcing mesh). 2. Arrange the mounting tape and secure it to the floor. 3. Arrange the heating cable and attach it to the tape in compliance with the pitch laid. Also on the tape to fix the floor sensor in a copper or corrugated tube and bring the 'cool' findings and conclusions of the cable sensor to the installation of thermostat. 4.Proizvesti filling solution or mixture.
Lay the floor covering (tile, carpet, etc.) 5. Establish thermostat and connect the sensor, 'cold' conclusions cable and network cable. 6. Withstand the cement-sand screed about 28-30 days to harden and turn on the thermostat. Note In the course of work on installation of heating cable or mat, screed and floor covering installation is necessary to control the ohmic resistance heating cable conductors and the integrity of the insulation. Upon completion of installation of the system must make a real circuit installation showing the main anchors of the location (the location of end joints, connective, and a temperature sensor, the number of filaments arranged in the cable, etc.). WARNING heating cable cut FORBIDDEN!